§ A720-10. Construction requirements.  


Latest version.
  • A. 
    Restoration. In the event that the company or its agents shall disturb any pavement, street surfaces, sidewalks, driveways or other surface in the natural topography, the company shall, at its sole expense, restore and replace such places or things so disturbed in as good a condition as existed prior to the commencement of said work.
    B. 
    Relocation. If at any time during the period of this consent, the municipality shall alter or change the grade of any street, alley or other way or place, the company, upon reasonable notice by the Township, shall remove, re-lay or relocate its equipment, at the expense of the company.
    C. 
    Removal or trimming of trees. During the exercise of its rights and privileges under this franchise, the company shall have the authority to trim trees upon and hanging over streets, alleys, sidewalks and other public places of the municipality so as to prevent the branches of such trees from coming in contact with the wires and cable of the company. Such trimming shall be only to the extent necessary to maintain proper clearance for the company's wires and cables.
    D. 
    Movement of building and equipment. The company shall, at the request of the Township and at the expense of the company, temporarily raise, lower or remove its lines and/or equipment in order to facilitate the moving of buildings or machinery or other like circumstances. However, if such request is occasioned or necessitated as a result of any nonmunicipal work or projects of any kind by any third party, then and in such event the cost and expense for the company to temporarily raise, lower or remove its lines and/or equipment to facilitate the moving of any buildings or machinery or other like circumstances shall be borne directly by such third party.